NFPA 13 Installation Criteria Updates for the 2016 Edition

 

Class Type On Demand
Running Time 90 min
CEUs 1.50
Categories

Contractor I

Contractor II

Water-Based Inspector


The installation chapters of NFPA 13 include chapters 1, 2, 3, 4, 6, 7, 8, 25, 26 and 27. Changes for the 2016 edition to these chapters will significantly affect the layout and installation of sprinkler systems and is a “must-know” for layout technicians, installers, AHJs and others in the industry. This seminar will focus on the major changes including new criteria for “Cloud Ceilings”, new requirements for air venting of wet systems to prevent corrosion, changes in obstruction rules, new requirements for sprinkler protected glazing, main drain sizing and more.

Approved for Contractor I, II and Waterbased Inspectors

 

You must be signed in to purchase this class.

Sign In

Create an Account